A new multistorey car park and terminal drop-off facility to replace one lost to fire. The steel framed structure has a 90-minute fire rating using large steel sections and intumescent paint. Level 00 provides a drop-off zone handling 1,900 vehicles/hour with 98 non-disabled bays and 7 disabled bays. Levels 01–04 accommodate 1,954 cars, with the open-top deck on Level 04.

Composite decks drain to the perimeter systems that manage rainwater, sprinkler run-off, and fire containment. Four precast-concrete cores contain lifts, stairs, dry/sprinkler risers, and firefighting facilities; finishes are functional and compliant with BS 8300 and BS 9999.

The open façades use galvanised steel mesh on tensioned cables and vehicle impact barriers. Lighting, fire detection, and sprinkler systems are exposed and easily maintained, while pedestrian routes, handrails, and finishes prioritise safety, visibility, and accessibility.









When the Building Safety Act came out and competency needed to be tested, Fatkin were on it so quick.
That gave us confidence - others weren't so proactive.